Removal and installation of the lever of switching of RKPP
Details of installation of assembly of the lever of switching of RKPP
1 — the Bolt 2 — the Spring coupling 3 — the Pin
4 — the Selector hinge 5 — the Connecting disk 6 — Lever assembly
PERFORMANCE ORDER
The spring coupling acts in film by means of nippers.
For extraction of a pin use a suitable drift.
At installation of the lever track observance of requirements of Specifications of Head the Five-step manual box of gear shifting to efforts of a tightening of carving fixture.