KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
   Security measures and the general rules accepted at service of components of fuel paths of internal combustion engines
   Power supply system of petrol engines
   Power supply system of diesel engines
   Control systems of the engine and decrease in toxicity of the fulfilled gases
   System of production of the fulfilled gases
      General information
      Check of a condition of components of system of production of the fulfilled gases
      Removal and installation of components of system of production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections



Kia Sportage>> Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases>> System of production of the fulfilled gases>> Removal and installation of components of system of production of the fulfilled gases

Removal and installation of components of system of production of the fulfilled gases

See the prevention at the beginning of the section Check of a condition of components of system of production of the fulfilled gases!

Reception pipe with the catalytic converter

 PERFORMANCE ORDER

    Release nuts of fastening of reception section to a final collector / турбокомпрессору. Give fixing nuts and separate the catalytic converter from connecting section. Remove assembly of reception section with the catalytic converter and two sealing laying. Carefully smooth out interfaced surfaces of connecting flanges, prepare replaceable sealing laying. Installation is made as it should be, the return to an order of dismantle of components, - track observance of requirements of Specifications of Head of the Power supply system, management of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases to efforts of a tightening of carving fixture.

Exhaust silencer

 PERFORMANCE ORDER

    Release fastening nuts at first back, then forward connecting flanges of assembly of the exhaust silencer with a connecting pipe. Remove from arms four rubber подвеса and take the exhaust silencer from under the car.
FRT — the Direction forward on the car
    Remove two sealing laying and carefully smooth out interfaced surfaces of connecting flanges, - laying is subject to replacement without fail. Installation is made upside-down, - rubber подвесы before installation it is necessary to grease with silicone greasing, track observance of requirements of Specifications of Head of the Power supply system, management of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases to efforts of a tightening of carving fixture.

Exhaust pipe

 PERFORMANCE ORDER

    Remove rubber подвес an exhaust pipe from a basic arm, then release nuts of a connecting flange.
FRT — the Direction forward on the car
    Take a pipe from under the car. Remove sealing laying. Installation is made upside-down, do not forget to replace rubber подвес and to grease it before installation by silicone greasing, fixing nuts tighten with demanded effort.