KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
   General information
   Assessment of a condition of components of a suspension bracket and steering drive
   Forward suspension bracket
   Back suspension bracket
   Steering
      General information
      Air removal from a working path of system of hydrostrengthening of a wheel
      Check of a pressure of the steering pump
      Removal, check and installation of a steering wheel and steering column
      Removal and installation of tips of steering drafts
      Removal and installation of components of a steering drive
      Removal and installation of the steering pump
   Suspension bracket geometry
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections



Kia Sportage>> Suspension bracket and steering>> Steering>> Check of a pressure of the steering pump

Check of a pressure of the steering pump

Do not hold a steering wheel at the working engine in extreme provisions within more than 15 seconds!


 PERFORMANCE ORDER

    Disconnect the pressure head line of a hydraulic path from a case of the steering mechanism and connect to it a measuring set, - the gate from a set should be connected on the party of the steering mechanism. Shtutsernye should be tightened connections with effort of 31 ÷ 47 Nanometers.
1 — To the pump
2 — To the steering mechanism
3 — the Thermometer (50 ÷ 60 °C)
4 — the Manometer
5 — the Locking gate
    Execute the pumpings procedure of a hydraulic path (see. The section air Removal from a working path of system of hydrostrengthening of a wheel). Completely open the gate the gate connected to system, then start the engine and several times turn a steering wheel from an emphasis against the stop for the purpose of warming up of hydraulic liquid to normal working temperature (50 ÷ 60 °C). Lift engine turns to value 1000 ÷ 1500 in a minute, close the gate and consider the manometer indication, - demanded value makes 6860 ± 98 kPas (70 ± 1 kgf/cm2). Close the gate and at 1000 ÷ 1500 mines working with turns -1 engine turn a steering wheel from an emphasis against the stop, - the indication of a manometer should remain the same.

In order to avoid an overheat of hydraulic liquid do not hold the gate closed more than within 15 seconds!

    Muffle the engine, disconnect a manometer and the gate and restore initial connection of hydraulic lines, having tightened shtutserny sockets with demanded effort (31 ÷ 47 Nanometer). In summary "pump over" a hydraulic path (see. The section air Removal from a working path of system of hydrostrengthening of a wheel).