KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning
   General information
   System of cooling of the engine
   Systems of ventilation, heating and air conditioning
      General information and security measures
      Diagnostics of malfunctions, check of components of To/in system
      Removal and installation of assembly of the forcing fan/evaporator, service of components
      Removal and installation of assembly of a heater, service of components
      Removal and installation of lines of communication of a refrigerator path of To/in system
      Removal, check and To/in compressor installation
      Removal, check and installation of the fan of the To/in condenser
      Removal, check and To/in condenser installation
      Removal, check and receiver dehumidifier installation
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections



Kia Sportage>> Systems of cooling, heating, ventilation and air conditioning>> Systems of ventilation, heating and air conditioning>> Removal and installation of lines of communication of a refrigerator path of To/in system

Removal and installation of lines of communication of a refrigerator path of To/in system

 PERFORMANCE ORDER

    Prop up wheels protivootkatny boots. Strengths of the trained professional make a discharge of a refrigerator path of К/В system.

Evaporator lines

Removal

 PERFORMANCE ORDER

    Check components of an okhladitelny path of the engine on existence of signs of development of leaks. Disconnect and remove the storage battery. Turn out fixing bolts, disunite sockets of electroconducting and a connecting hose of the submitting pump and remove the tank of liquid of washing of a windscreen in an impellent compartment (see. Head Body). Release shtutserny nuts/bolts since both ends of the line subject to removal.
    Turn out nuts of fixing collars.
    Liberate the line from intermediate clamps and remove it from the car.

Installation

 PERFORMANCE ORDER

    Get the replaceable line on the regular place and latch it in intermediate clamps.
    Manually acquire on pair of rounds of a carving both shtutserny nuts. Level the line and tighten shtutserny nuts with demanded effort (13 Nanometers and 32 Nanometers). Screw bolts of fastening of the socket to a partition of an impellent compartment and tighten them with demanded effort (24 Nanometers). Screw and tighten a small fixing nut. Strengths of the trained professional make evacuation, vacuum check and a charging of a refrigerator path of К/В system. Establish and connect the storage battery. Start the engine, activate To/in and examine shtutserny sockets of a refrigerator path on existence of signs of development of leaks. In case of need make the corresponding corrections.

Flexible hoses

Removal

 PERFORMANCE ORDER

    Release nuts of shtutserny connections and remove the corresponding hose.

Installation

 PERFORMANCE ORDER

    Get a hose on the regular place. Screw shtutserny nuts and tighten them with demanded effort (depending on a connection point). Strengths of the trained professional make evacuation, vacuum check and a charging of a refrigerator path of К/В system. Start the engine, activate To/in and examine shtutserny sockets of a refrigerator path on existence of signs of development of leaks. In case of need make the corresponding corrections.