KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning General information System of cooling of the engine Systems of ventilation, heating and air conditioning General information and security measures Diagnostics of malfunctions, check of components of To/in system Removal and installation of assembly of the forcing fan/evaporator, service of components Removal and installation of assembly of a heater, service of components Removal and installation of lines of communication of a refrigerator path of To/in system Removal, check and To/in compressor installation Removal, check and installation of the fan of the To/in condenser Removal, check and To/in condenser installation Removal, check and receiver dehumidifier installation
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections
|
|
|
|
Kia Sportage>> Systems of cooling, heating, ventilation and air conditioning>> Systems of ventilation, heating and air conditioning>> Removal and installation of lines of communication of a refrigerator path of To/in system
Removal and installation of lines of communication of a refrigerator path of To/in system
|
Prop up wheels protivootkatny boots.
Strengths of the trained professional make a discharge of a refrigerator path of К/В system.
|
|
Evaporator lines
Removal
|
Check components of an okhladitelny path of the engine on existence of signs of development of leaks.
Disconnect and remove the storage battery.
Turn out fixing bolts, disunite sockets of electroconducting and a connecting hose of the submitting pump and remove the tank of liquid of washing of a windscreen in an impellent compartment (see. Head Body).
Release shtutserny nuts/bolts since both ends of the line subject to removal.
|
Turn out nuts of fixing collars.
|
|
Liberate the line from intermediate clamps and remove it from the car.
|
|
|
Installation
|
|
Get the replaceable line on the regular place and latch it in intermediate clamps.
|
Manually acquire on pair of rounds of a carving both shtutserny nuts.
Level the line and tighten shtutserny nuts with demanded effort (13 Nanometers and 32 Nanometers).
Screw bolts of fastening of the socket to a partition of an impellent compartment and tighten them with demanded effort (24 Nanometers).
Screw and tighten a small fixing nut.
Strengths of the trained professional make evacuation, vacuum check and a charging of a refrigerator path of К/В system.
Establish and connect the storage battery.
Start the engine, activate To/in and examine shtutserny sockets of a refrigerator path on existence of signs of development of leaks. In case of need make the corresponding corrections.
|
|
Flexible hoses
Removal
|
Release nuts of shtutserny connections and remove the corresponding hose.
|
|
Installation
|
Get a hose on the regular place.
Screw shtutserny nuts and tighten them with demanded effort (depending on a connection point).
Strengths of the trained professional make evacuation, vacuum check and a charging of a refrigerator path of К/В system.
Start the engine, activate To/in and examine shtutserny sockets of a refrigerator path on existence of signs of development of leaks. In case of need make the corresponding corrections.
|
|
|
|