KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning General information System of cooling of the engine Systems of ventilation, heating and air conditioning General information and security measures Diagnostics of malfunctions, check of components of To/in system Removal and installation of assembly of the forcing fan/evaporator, service of components Removal and installation of assembly of a heater, service of components Removal and installation of lines of communication of a refrigerator path of To/in system Removal, check and To/in compressor installation Removal, check and installation of the fan of the To/in condenser Removal, check and To/in condenser installation Removal, check and receiver dehumidifier installation
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections
|
|
|
|
Kia Sportage>> Systems of cooling, heating, ventilation and air conditioning>> Systems of ventilation, heating and air conditioning>> Removal, check and receiver dehumidifier installation
Removal, check and receiver dehumidifier installation
Removal
|
Disconnect a negative wire from the battery.
Strengths of the trained professional make a discharge of a refrigerator path of К/В system.
|
Disconnect from a receiver dehumidifier of the line of a refrigerator path, - at once закупорьте the open ends of shtutserny sockets.
|
Remove from a basic arm and put aside on a wing mudguard assembly of a coal adsorber.
|
Disunite the contact socket of electroconducting.
|
Give three fixing nuts and remove a receiver dehumidifier.
|
|
Check of the two-level sensor switch of pressure
|
Switch off ignition.
Operating according to instructions of manufacturers, connect special measuring knot and measure pressure in a high-pressure head contour of a refrigerator path. If the result of measurement differs from value of 608 kPas, make check of components of a refrigerator path, otherwise pass to the following stage.
|
Disconnect electroconducting from the two-level sensor switch and check the contact socket of the last on conductivity existence between No. No. 1 and 2 plugs. If the result of measurement differs from demanded, replace the sensor switch.
|
|
|
Installation
|
Installation is made as it should be, the return to an order of dismantle of components, - track observance of requirements of Specifications of the Head of System of cooling, heating, ventilation and air conditioning to efforts of a tightening of carving fixture.
In summary strengths of the trained professional make evacuation, vacuum check and a charging of a refrigerator path of To/in system, then start the engine, activate To/in and examine shtutserny sockets of a refrigerator path on existence of signs of development of leaks. In case of need make the corresponding corrections.
|
|
|
|