KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning
   General information
   System of cooling of the engine
      Cooling liquid - general information
      Replacement of cooling liquid - general comments
      Tightness check, replacement of hoses of system of cooling
      Thermostat check
      Check of serviceability of functioning of the coupling of coupling of the fan of system of cooling
      Washing of a path of system of cooling
      Removal and thermostat installation
      Removal, check of a condition and installation of a radiator of system of cooling, replacement of radiatorny hoses
      Removal and installation of a broad tank
      Removal and installation of a perepuskny branch pipe of an okhladitelny path of the petrol engine
      Replacement of the bearing of a drive of the fan of system of cooling
      Removal, installation and service of the water pump
   Systems of ventilation, heating and air conditioning
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections



Kia Sportage>> Systems of cooling, heating, ventilation and air conditioning>> System of cooling of the engine>> Removal, installation and service of the water pump

Removal, installation and service of the water pump

Petrol models

 PERFORMANCE ORDER

    The water pump established on petrol models is not maintainable and, - in case of identification of signs of development of leaks in a look потеков cooling liquid around a cover of a drive of GRM, - is subject to replacement. Remove protection of a case. Uncover a radiator. Open the drain gate and lower cooling liquid from a radiator in the prepared capacity of suitable volume. Remove the top and bottom radiatorny hoses. Remove perelivny a hose going from a jellied mouth of a radiator to a broad tank. Remove an air inlet of an inlet air path (see. Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases). Remove a krylchatka of the fan, and also a casing of ventilyatorny assembly. Release fixing and adjusting bolts of the generator, then remove a belt of a drive of the generator.
1 — a 4-costal driving belt
2 — the Adjusting bolt
    Remove a pulley of a drive of the fan of system of cooling (see. Section Replacement of the bearing of a drive of the fan of system of cooling). Remove bearing assembly of the fan (see. Section Replacement of the bearing of a drive of the fan of system of cooling). Remove the top and bottom covers of a drive of GRM (see. Head Engine). Turning a cranked shaft in the normal direction, bring the piston of the first cylinder into the provision VMT of the end of a step of compression. Release a lock bolt, take away a roller of a natyazhitel from a tape of a gas-distributing belt, then again tighten a lock bolt. Remove from a cogwheel of a drive of the water pump and take aside a gas-distributing belt. Again release a bolt of a natyazhitel. Turn out fixing bolts and remove assembly of the water pump.
1 — Covers of a drive of GRM with sealing elements
2 — the Intermediate roller
3 — Assembly of the water pump
4 — Sealing laying
    Remove from pump assembly an intermediate roller. Carefully smooth out interfaced surfaces of the pump and the engine block. Installation is made as it should be, the return to an order of dismantle of components, - track observance of requirements of Specifications of the Head of System of cooling, heating, ventilation and air conditioning to efforts of a tightening of carving fixture. In summary start the engine and check it on existence of signs of development of leakages of cooling liquid. In case of need make the corresponding corrections, modify heat-carrier level.

Diesel models

Removal and installation

Details of installation of the water pump of system of cooling of the diesel engine

1 — the Top radiatorny hose
2 — the Casing of the fan of system of cooling
3 — Krylchatka and a driving pulley of the fan
4 — Belts of a drive of the generator and the To/in compressor
5 — the Generator
6 — Natyazhitel of a belt of a drive of the To/in compressor

7 — the Pulley of a cranked shaft
8 — the Top and bottom sections of a cover of a drive of GRM
9 — Natyazhitel of a gas-distributing belt with a spring
10 — the Gas-distributing belt
11 — Nizhny a radiatorny hose
12 — a heater Hose
13 — Assembly of the water pump with a tension level of the generator


 PERFORMANCE ORDER

    Turning a cranked shaft in the normal direction, bring the piston of the first cylinder into the provision VMT of the end of a step of compression. Empty cooling system (see. Head Current leaving and service). Details of installation of the water pump are shown, - dismantle components as their numbering. Installation is made upside-down. Track observance of requirements of Specifications of the Head of System of cooling, heating, ventilation and air conditioning to efforts of a tightening of carving fixture.

Service

Design of the water pump of system of cooling of the diesel engine
1 — the Cover
2 — Sealing laying
3 — the Case

 PERFORMANCE ORDER

    In case of need the water pump can be disassembled for the purpose of check of a condition of its internal components and replacement of sealing laying. The design of the water pump is shown, - act as numbering of components.

It is not necessary to make dismantling of the case of the water pump! In case of need the case is replaced assembled with internal components.

    Assembly is made in an obraty order.