KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning
   General information
   System of cooling of the engine
      Cooling liquid - general information
      Replacement of cooling liquid - general comments
      Tightness check, replacement of hoses of system of cooling
      Thermostat check
      Check of serviceability of functioning of the coupling of coupling of the fan of system of cooling
      Washing of a path of system of cooling
      Removal and thermostat installation
      Removal, check of a condition and installation of a radiator of system of cooling, replacement of radiatorny hoses
      Removal and installation of a broad tank
      Removal and installation of a perepuskny branch pipe of an okhladitelny path of the petrol engine
      Replacement of the bearing of a drive of the fan of system of cooling
      Removal, installation and service of the water pump
   Systems of ventilation, heating and air conditioning
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections



Kia Sportage>> Systems of cooling, heating, ventilation and air conditioning>> System of cooling of the engine>> Removal, check of a condition and installation of a radiator of system of cooling, replacement of radiatorny hoses

Removal, check of a condition and installation of a radiator of system of cooling, replacement of radiatorny hoses

Petrol models

 PERFORMANCE ORDER

    Remove protection of a case.
    Uncover a radiator, open the drain gate (1) and lower cooling liquid in the prepared drain capacity of suitable volume.
    Release fixing collars and remove top (1) and the bottom (2) radiatorny hoses.
    Disconnect from a radiator going to a broad tank perelivny a hose.
    Turn out fixing bolts and remove an air inlet of an inlet air path (1) engine.
    Turn out five bolts of fastening of a casing (1) ventilyatorny assembly.
    Turn out bolts of basic arms and, having submitted up, take a radiator from an impellent compartment.
    Examine the radiator heat exchanger on existence of signs of development of leaks, deformations lamely both connecting branch pipes, and other mechanical damages. In case of need replace a radiator, or deliver it in a specialized workshop for performance of the corresponding regenerative repair.
    Attentively study a condition of radiatorny hoses, in case of need prepare replacement. Installation is made upside-down, - track reliability of fixing of radiatorny hoses fixing collars and behind observance of requirements of Specifications of the Head of System of cooling, heating, ventilation and air conditioning to efforts of a tightening of carving fixture. In summary fill system of cooling with a fresh mix (see. Head the Current leaving and service), start the engine, warm it to normal working temperature, then, - if it is required, - modify heat-carrier level. Establish into place a cover of a radiator and, without suppressing the engine, check the corresponding components of an okhladitelny path on existence of signs of development of leaks.

Diesel models

Details of installation of a radiator on diesel models

1 — the Broad tank with a perelivny hose
2 — the Top radiatorny hose
3 — the Casing of ventilyatorny assembly

4 — Nizhny a radiatorny hose
5 — the Socket of the sensor of level of cooling liquid
6 — the Radiator


 PERFORMANCE ORDER

    Empty cooling system (see. Head Current leaving and service). The general principle of performance of procedure is similar described above for petrol models. Dismantle components, operating as their numbering.