Removal and installation of the inlet pipeline and final collector
Details of installation of the inlet pipeline and final collector
1 — Shchup of measurement of level of impellent oil 2 — the Basic arm of the fan 3 — EGR Tube 4 — Termozashchitny the screen of a final collector 5 — the Final collector 6 — the Tube of an okhladitelny path / перепускной a branch pipe 7 — the Elevating eye
8 — the Generator 9 — the Basic arm of the generator with an adjusting level 12 — the Rack of the inlet pipeline 13 — Assembly of the inlet pipeline with the air distributor 14 — the Oil filter 15 — Maslookhladitel 16 — the Sensor of pressure of oil
At installation the tightening of bolts of fastening of the pipeline should be made strictly in a certain order.
Order of a tightening of bolts of fastening of the inlet pipeline.