KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
   Check of kompressionny pressure, assessment of a condition of cylinders
   Engine check by means of the vacuum gage
   Belts of a drive of auxiliary units
   Petrol models
      Greasing system - the general information, check of pressure of impellent oil
      Removal and engine installation
      Removal and installation of components of a drive of GRM
      Removal and installation of the inlet pipeline and final collector
      Service of a head of cylinders and components of the gas-distributing mechanism
      Dismantling and assembly of the block of cylinders, service of components
      Removal and installation of the pallet of a case
      Removal, installation and service of the oil pump
      Removal and flywheel installation / driving disk
      Removal and installation of masloraspylitel
      Replacement of epiploons of a cranked shaft
   Diesel models
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections



Kia Sportage>> Engine>> Petrol models>> Removal and installation of the pallet of a case

Removal and installation of the pallet of a case

This procedure is among those which performance does not demand removal of the engine from the car.

Removal

 PERFORMANCE ORDER

    Disconnect a negative wire from the battery.
    Turn out two top bolts of a rack of the inlet pipeline.
    Hang out the car over the zemlny. Merge impellent oil (see. Head the Current leaving and service), then screw on a place and tighten with demanded effort a drain stopper, - in case of need replace its sealing washer. Prop up the forward bridge assembled with kardanny in bulk. Turn out three bolts of fastening of a case of the forward bridge and remove the left plug of a support of its suspension bracket. Carefully lower the bridge.
    Turn out fixing bolts and remove the intensifying kerchiefs, established from both parties of the engine, - for fastening of each kerchief four bolts are used.
    Turn out the corresponding bolts (3 + 4 pieces) and remove panels of protection of cases of the engine and transmission. Turn out 19 bolts of fastening of the pallet of a case of the engine. Hooking a thin shpatel, or other suitable tool, accurately separate the pallet from a maslootrazhatel, - try not to bend a fixing flange of the pallet and not to damage a maslozaborny tube.
Details of installation of the pallet of a case (3), a maslozabornik (2) and a maslootrazhatel (1), - do not forget to check a condition of a drain stopper (4).
    Turn out four fixing bolts and remove the maslozabornik equipped with the mesh filter, - try not to bend a maslootrazhatel and not to damage a maslozaborny tube. Turn out one fixing bolt and remove a maslootrazhatel. Carefully clear interfaced surfaces of the removed components, having completely removed from them traces of oil, dirt and the remains of old hermetic. Examine the pallet on existence of cracks, deformations and other mechanical damages. In case of need make the corresponding regenerative repair, or replace the pallet. Estimate a condition of a drain stopper of the pallet, in case of need make its replacement.

It will be reasonable to replace a sealing washer of a drain stopper regardless of its condition.

    Check a condition of a maslootrazhatel and the mesh filter of a maslozabornik. Carefully clean components, in case of identification of irreversible damages make replacement.

Installation

The size of a vystupaniye of the pallet for borders of a face surface of a case of the engine should not exceed 1.5 mm.


 PERFORMANCE ORDER

    Impose a pillow of hermetic of the Loctite Ultra Blue 5900 type on an interfaced surface of a landing flange of a maslootrazhatel and press the last to the engine case which interfaced surface also should be smoothed carefully out and fat-free. Track, that hermetic was imposed from the interior of fixing openings and with a tipping over on the ends. Screw a bolt of fastening of a plate and tighten it with demanded effort (9.5 Nanometers).
    Establish into place a maslozabornik and tighten with demanded effort (9.5 Nanometers) four bolts of its fastening.
    Operating in the manner similar described, put hermetic on an interfaced surface of a landing flange of the pallet, then press the last to a maslootrazhatel, screw 19 fixing bolts and, operating strictly in a certain order, in stages tighten them with demanded effort (9.5 Nanometers).
    Further installation is made as it should be, the return to an order of dismantle of components. Do not forget about need of observance of requirements of Specifications of Head the Engine to efforts of a tightening of carving fixture. Fill in in the engine fresh engine oil. In summary start the engine and check it on existence of signs of development of leaks through joints of the established components.