KIA of Sportazh - Kia Sportage
Governing bodies and operation receptions
Current leaving and service
Engine
Systems of cooling, heating, ventilation and air conditioning
Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases
   Security measures and the general rules accepted at service of components of fuel paths of internal combustion engines
   Power supply system of petrol engines
      General information
      Check and adjustment of quantity of turns of the single course/the moment of ignition/concentration WITH
      Sbrasyvaniye of pressure in fuel system of the petrol engine, filling of a fuel path
      Power supply system checks
      Removal and installation of components of an inlet air path
      Removal and installation of a pedal of gas, adjustment of a cable of a drive of a butterfly valve
      Removal and installation of a fuel tank
      Removal and installation of the fuel pump
      Removal and installation of the sensor of a stock of fuel
      Removal and installation of the control and locking valve
      Removal and installation of submitting and returnable lines of a fuel path
      Removal and installation of a jellied mouth of a fuel tank and separator of fuel evaporations
      Removal and installation of the filter of thin cleaning of a fuel path
      Removal and installation of a regulator of pressure of fuel
      Removal and installation of the toplivoraspredelitelny highway
      Removal and installation of fuel injectors
   Power supply system of diesel engines
   Control systems of the engine and decrease in toxicity of the fulfilled gases
   System of production of the fulfilled gases
Systems of electric equipment of the engine
Five-step manual box of gear shifting
Automatic transmission
Transmission line
Brake system
Suspension bracket and steering
Body
Onboard electric equipment
Control body sizes
Schemes of electric connections



Kia Sportage>> Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases>> Power supply system of petrol engines>> Removal and installation of the toplivoraspredelitelny highway

Removal and installation of the toplivoraspredelitelny highway

See the prevention at the beginning of the Section Removal and installation of the fuel pump!

See also materials of the Section Removal and installation of components of an inlet air path.

Details of installation of the toplivoraspredelitelny highway

1 — Negative hollow batteries
2 — Elektroprovodka of connection of injectors with contact sockets
3 — the Regulator of pressure of fuel
4 — the Fuel hose

5 — the highway Toplivoraspredelitelnaya
6 — the Lock ring
7 — the Injector
8 — the Sealing ring
9 — the Damper of pulsations of pressure


 PERFORMANCE ORDER

    Dump pressure in a power supply system (see. Undressed Sbrasyvaniye pressure in fuel system of the petrol engine, filling of a fuel path). Merge cooling liquid (see. Head Current leaving and service). Disconnect a negative wire from the battery. Turn out two bolts of an air line of an inlet air path. Release a collar of fastening of shlangovy section of an air line to inlet section of the case of a throttle. Remove four ventilating hoses connected in an air line. Disconnect electroconducting from the MAF sensor. Turn out bolts of fastening of assembly of the MAF sensor. Release a collar of fastening of an air line to air purifier assembly. Turn out a bolt of fastening of a basic arm of an air line. Turn out bolts of fastening of a basic arm of a cable of a drive of butterfly valves. Disconnect a cable of a drive of butterfly valves. Remove the vacuum hose going from the inlet pipeline to a vacuum tube. Disconnect electroconducting from TPS and the IAC valve. Disconnect two hoses of an okhladitelny path from the throttle case. Release a fixing collar and disconnect a hose of assembly of the IAC valve. Release a collar and disconnect a hose from the air distributor. Release collars and disconnect from the air distributor vacuum hoses of the brake amplifier and темпостата. Turn out two fixing bolts and remove the air distributor a basic arm. Turn out the bottom bolt of a basic arm of the IAC valve. Turn out two top bolts of a basic arm of the inlet pipeline. Hang out the car over the earth. Turn out the bottom bolts of a basic arm of the inlet pipeline. Lower the car on the earth. Disconnect from a knee an inlet hose of a heater. Disconnect a vacuum hose from a vacuum tube. Give three bolts with nuts and remove the air distributor. Disconnect топливопровод from a pressure regulator. Disconnect submitting hose from the toplivoraspredelitelny highway. Turn out two bolts of fastening of the highway. Remove clamps of fastening of injectors and remove the toplivoraspredelitelny highway. Remove two injector insulators (see. Section Removal and installation of fuel injectors). Remove a damper of pulsations of pressure. Remove a regulator of pressure of fuel (see. Section Removal and installation of a regulator of pressure of fuel). Carefully smooth out all interfaced surfaces. Installation is made upside-down. Do not forget to adjust a cable of a drive of a butterfly valve (see. Section Removal and installation of a pedal of gas, adjustment of a cable of a drive of a butterfly valve). In summary fill cooling system, start the engine and check it on existence of signs of leakages of the corresponding working liquids.